WestConnex Stage 3A Saint Peter’s Interchange M&E Secondary Steel
Description: This project involved design, fabrication and supply of structural steel and supply and installation for the Mechanical and Electrical Support at the Saint Peter’s Interchange site. It required detailed design of primary, secondary and tertiary beams and their connection type to suit the inconsistent tunnel walls. To successfully achieve the completion of the project, TSS conducted smooth design change to suit all connection in perfect stability, while keeping up with the scheduled deadline.
Client: Acciona + Bouygues + Samsung JV
Location: Saint Peter’s Interchange site
Duration: May 2021 – Dec 2021