WCX 3A – Site Wide Staircases + Handrails

WestConnex Stage 3A Site Wide Staircases and Handrails

Description: TSS was tasked with supplying and installing key support access staircases and railing systems across all three of the M4-M5 Link sites. In particular, following scope was included but not limited to:

  • 8 Multi-flight structural staircases of varying sizes and complexity
  • 11 Single-flight structural staircases
  • Handrails on concrete structures and vertical platforms
  • Handrails on top of emergency egress routes at 44 different locations
  • Handrails on top of substations across 5 locations 
  • Deluge manifolds at 19 special cross passage areas
  • 648m of handrails inside of longitudinal egress passages, 1762m of handrails on top of longitudinal egress passages 

Client: Acciona + Samsung + Bouygues JV

Location: Haberfield, Saint Peters, Pyrmont Bridge Road Sites

Duration: Dec 2020 – Ongoing