WCX 3B – Rozelle Site Office Support Structure

WestConnex Stage 3B – Rozelle Gantry

Description: Initial preparation of the Rozelle Interchange required the fabrication and installation of a gantry frame to support an elevated office complex structure. A total of 180 tonnes of steel was required to complete the project in four major erection stages.

Client: John Holland CPB JV

Location: Rozelle Interchange, Lilyfield

Duration: Nov 2019 – Dec 2020